The utility model relates to a high integrated general duplexer module for mobile communication duplex tower top amplifiers. 一种用于移动通信双工塔顶放大器的高集成化通用双工器模块。
Abstract: An integrated absorption/ desorption unit with single tower in FCCU is proposed. 文摘:提出一种新的催化裂化吸收-解吸单塔流程。
Manufacture and Inspection of Integrated Multilayer Clamping Stainless Alloy Lining Urea Tower 整体多层夹紧式不锈钢衬里尿素合成塔制造和检验
Integrated Construction Technology of Cable Erection Bent Tower Fastening of Longtan River Bridge 龙潭河大桥缆索吊装塔架扣架一体化施工技术
Collaborative optimization algorithm of multi-disciplinary design optimization strategy was applied to the integrated preliminary design of a tower crane's metal structures. As for the computational difficulties appeared during solving the system-level optimization in collaborative optimization, an unconstrained optimization problem was formed. 将多学科设计优化中的协作优化算法应用于塔式起重机金属结构的整体优化设计,针对协作优化算法系统级优化问题存在的计算困难,将其转化为无约束问题处理。
Construction Technique of an Integrated Liquid Pressure Lifting of a Telecommunication Tower across two Suprem Court Building at Liaoning 辽宁高法横跨双楼通讯塔整体液压提升施工技术
On Fully Integrated Design of Tower Crane Metal Structure Using Collaborative Optimization 基于协作优化的塔机金属结构一体化设计
Synchronizing Lift for the Integrated Steel Antenna Mast of Bright Oriental Pearl Radio and TV Tower 东方明珠广播电视塔钢天线桅杆同步整体提升
In this way, system optimal design was reached. At the same time, an integrated design system, revised Collaborative Optimization Based Tower Crane design optimization system ( COBTC), was developed based on the Matlab Graphic User Interface ( GUI). 采用Matlab的图形用户界面(GUI)对塔式起重机的一体化设计进行了系统集成,开发了基于改进协作优化算法的塔式起重机金属结构一体化设计系统(COBTC)。
The simulation method of cable and fixing tower during the integrated installation of cable tower and buckle tower is studied. 研究了缆、扣塔一体化施工过程中缆、扣塔的仿真模拟方法。
The key construction techniques of integrated installation of cable tower and buckle tower of XJ Bridge are studied and also the mechanical behavior of the cable and fixing tower during the construction process is analysed. 本文对XJ大桥缆、扣塔一体化施工的关键技术和施工过程中缆、扣塔的受力特性进行分析研究。
The main work and conclusions are as follows: 1. Key construction techniques of integrated installation of cable tower and buckle tower are studied and summarized. 主要完成的工作和取得的成果如下:1、对缆、扣塔一体化施工的关键技术进行了研究和总结。